Our Blogs
SAP PS Integration with MM and SD: Procurement to Billing
How SAP PS integrates with MM and SD: purchase requisitions from activities, project stock, goods issues, sales orders, assembly processing and billing.
SAP PS and FICO Integration: How Projects Meet Finance
How SAP PS integrates with FI and CO: org structure, cost elements, activity rates, overheads, the period-end close, assets and the S/4HANA Universal Journal.
SAP PS Settlement Explained: Rules, Receivers and Steps
How SAP PS settlement works: settlement rules, receivers, the settlement profile, CJ88 and CJ8G, assets under construction and period-end order.
Results Analysis (RA) in SAP PS Explained Simply
What results analysis does in SAP PS: POC methods, WIP, accrued and deferred revenue, loss provisions, KKA2 and KKAJ, and how RA connects to settlement.
Milestone Billing in SAP PS: Full Setup, Step by Step
How milestone billing works in SAP PS: billing elements, SD billing plans, milestones, billing blocks and invoicing, with the full setup and common errors.
Budgeting and Availability Control in SAP PS Explained
How budgeting and availability control work in SAP PS: original budget, release, supplements, transfers, tolerance limits and the budget profile settings.
SAP PS Project Cost Planning Guide: Methods, Steps and Tips
SAP PS cost planning explained: overall planning, cost element planning, Easy Cost Planning and network costing, with the steps, planning profile and pitfalls.
SAP PS Network and Activities Explained: A Practical Guide
How networks and activities work in SAP PS: activity types, relationships, scheduling, costing and how they link to the WBS. With tables and common mistakes.
How to Create a Project in SAP PS Using CJ20N (Project Builder)
A practical CJ20N tutorial: create a project in SAP PS with the Project Builder, from project definition and WBS to networks, scheduling and release. Includes the errors beginners hit and how to fix them.
SAP PS Work Breakdown Structure (WBS) Explained
The SAP PS WBS explained: what a WBS element is, the three operative indicators, how to create a WBS in CJ20N, how many levels to use, and how the WBS controls project cost from budget to settlement.
SAP PS Tutorial for Beginners: Learn SAP Project System Step by Step
A step-by-step SAP PS tutorial for beginners: build a project in CJ20N, plan costs, set the budget, post actuals, monitor and settle. Includes the transaction codes worth learning first.
What Is SAP PS (Project System)? A Beginner Guide
SAP PS (Project System) explained for beginners: what it is, what it does, its core objects (WBS, networks, activities), how a project runs end to end, and who uses it.